Upcoming Poole Borough Road/cycle works

This is recent communcation I have had with Poole Borough on Road works and Cycling Schemes. Responses given in italics. Next 6 months sees significant chance for Poole to prove they can design for the future, with adequate Space for Cycling.     Space for Cycling, Infrastructure.  View from User perspective. Challenge Fund Schemes Read this:- Point 3.8 states these actions should be happening Context–Poole Borough area, Timeline after Announcements 08 August– Boro of Poole win from only 19 councils  £535K from LTP for road re-surfacing works in the area, including the following in actual  date sequence:- Timing and Reason for this communication. Several of these Schemes represent serious chance for Borough of Poole to initiate building future space for cycling, using protected cycleways of the type being introduced in many areas of the U.K. Building separate protected cycleways initiates the up-take of active travel desired by current LTP’s. Some of these listed missed consideration due to timing, however upcoming works named here possess significant chances for the Borough to demonstrate future planning and provision for Active Travel. Consider the following- 1.Oct/ Nov 17– Longfleet Rd -complete, no changes made at all. Suggested shared pavement designation which didn’t transpire. :- Longfleet road has significant space however now completed due to time constraints. Re-painting of lines here show no coherence at all along the road length ranging from advisory hatches to solid lines and nothing at Bus stops. Response: Agree that the changes weren’t major but the following improvements were undertaken during the maintenance scheme at Longfleet Road: Kerbline/exit from George Rbt tightened and cycle lane introduced Refuge adj Elizabeth Rd rebuilt to improve visibility for pedestrians Existing advisory sections of cycleway re-designated as mandatory New Puffin Crossing installed on pedestrian desire line for hospital Improved bus layby to ensure rear of bus does not block cycleway New dropped access onto Longfleet Rd from Kingston Rd for cyclists Revised lining to improve safety for cyclists (i.e. lane widths adjusted – i.e. no longer between 3.2-4.0m) Advanced Stop Line extended and moved back to protect cyclists at Shah Junction PENDING – potential to extend proposed shared cycleway footway between Shah and Birds Hill – the reason that the suggested shared pavement designation hasn’t transpired yet. Picture 1  is the pavement mentioned at point 9 above       picture 2 is slightly further down southwards on same pavement         picture 3 is looking south on same pavement picture 4 shows the road width at the same point. 2.Nov/ Dec/17 Jan 2018 Ongoing  Blandford Rd at port – to Boro boundary, intermittent on road advisory cycle lanes, and A.S.L’s:- small improvements made to existing designs. Blandford Road ongoing with minor changes welcomed, whole road could benefit from re-design however likely to be well past consultation. Response: There is/was insufficient budget or time available for a complete redesign so the opportunity has been taken to reallocate road space for cyclists, reduce no. of vehicle lanes on approach to junction, reposition Advanced Stop Lines for cyclists.  Improvements for pedestrians at Coles Avenue junction.  Further improvements will be undertaken in January including extension of on road cycle lanes to borough boundary and widening of very narrow footway beneath railway bridges.  There is the potential to return to Blandford Road following the Challenge Fund and improve it further.  3. (July- Dec 17 (Separately funded scheme)- Boundary Lane 4th Arm. Opening of 4th Arm of roundabout to motor traffic, large re-design of main entrance /exit to University site for active travelling student population from local area Winton(ongoing) Work completed on the Boundary Lane 4th Arm of Roundbout shows significant failure to observe best design practice. Poole Cycling Officer and Lead of the University Travel Dept. are currently in discussion with Borough about correcting failures here.) Response: Just to clarify for others – scheme isn’t part of Challenge Fund.  As you’ve stated Poole’s Senior Walking and Cycling Officer is working on this item – I don’t know the history so am unable to comment on this.       Update 22 January- the lower picture shows the double yellow lines brought back into cycle space, and the Give way Triangle and dotted lines burnt off. Some improvement on what was absolutely shocking.   4. Dec 17 Ongoing. Magna Road- Queen Anne drive to border boundary Phase 1 East End, underway – Phase 2 in planning? From Poole Website- http://www.poole.gov.uk/transport-and-streets/roads-highways-and-pavements/ Feb 2018 Phase 2 Work on refurbishing existing and providing additional cycling facilities is scheduled to start on Monday 26 February for 4 weeks. More details will be provided nearer the time.? Magna Road / Queen Anne Drive, Work proceeding westwards towards Gravel Hill. This again has large off road space either side, wide lanes which is 100% suited to a protected cycle lane treatment on this arterial road. As yet no evidence of considering space for cycling. Response: There is/was insufficient budget and time available for a complete redesign so the opportunity has/is being taken to install on road cycle lanes, install pedestrian crossing in Bearwood and improve off road provision by widening and extending shared cycleway/footway as part of this maintenance scheme.     5. Feb 2018 Alder Road, no road surfaced cycle lanes at all at present- related current communication:- As you may be aware as part of the successful Challenge Fund bid we are due to resurface the entire length of Alder Road (except the part near to Mossley Avenue that was done last year).  It is planned for this resurfacing to take place in February 2018, likely the 2 weeks starting 12th Feb however this is yet to be confirmed.  As part of the resurfacing there will be a redesign of white lining to include cycle lanes where possible (mainly in uphill sections) and there are plans to upgrade the signals at the Herbert Avenue junction to include pedestrian crossing facilities as well as plans to improve communication between the Yarmouth Road and Herbert Avenue signals.  This is not an exhaustive list and plans …